Kiosk
Search
English
Deutsch
English
Français
Español
Русский
Português
Language
Cover
Contents
Quality from the outset
WHY track renewal or track laying?
HOW? – The right process for every task
WHICH TECHNOLOGIES are used?
Determinants – What needs to be considered?
Assembly-line method Continuous-action and modularly assembled machine systems
Environmentally friendly track renewal - Innovative construction technologies and sustainable materials management
The history of our track renewal trains - An impressive track record
What is important for the work units of the machine systems?
Rail guiding
Removal of old sleepers
Sleeper transport
Working drive
Excavated ballast
Sleeper laying
Cabs
Control system in line with existing geometry
Preparatory work
Preparatory work for TRACK RENEWAL
Preparatory work for track laying
Sleeper logistics
Rail logistics
Steps in track laying
How to RENEW TRACK
Track removal
Further applications
Reduce track possessions by bundling work sequences
Finalization of the track- Final work
Depending on the amount of loading, worn components such as sleepers and rails must be replaced periodically on each track. Here you will find all you need to know about the technology and process of track renewal or track laying with our innovative mach
Technologie - für Sie recherchiert
New track with the assembly-line method
Fundamentals
| Best practice
| Work technology
Quality from the outset
WHICH TECHNOLOGIES are used?
Preparatory work
Consent for the technology app
Information on the processing of your personal data
I give my consent